Your position: KLD Accessories and Service__Installation Guide


Step1:Preparation
Leave the planks to acclimatize for 48 hours in ready-paved room. The ideal room temperature is approx. 22℃ and the ideal air humidity approx. 55%.
Step 2: Pave with damp-proof layer
Clean and smoothen the subfloor, remove any grease; install the damp-proof layer; check the laminate planks for any damage.
Step 3: The first row
Place a plank in the corner, with the long side of the tongue turned towards the wall. Make the shorter side of the tongue insert into the shorter side of notch of the first plank, and the turn it and connect with the firstly plank evenly.Complete the installation of the first row of planks following the above method. Remember that an 8 to 10mm expansion should be kept between the first row and the wall.
Step 4: The process of installation Start the second row. Insert the longer tongue side of a plank into the notch of that of the previous row, and turn it downward and push it forward so as to ensure it can be connected with the previous row evenly. Take off a plank and insert its shorter tongue side into the shorter tongue side of the previous plank and push it downward against the previous row.
a.
Carefully put this plank with the previous plank in the same row together, and turn around 30℃ together.
b.
Push downward along the previous row of planks.
c.
Can push downward only when the planks are totally connected.
Step 5: The final row
Once again, make sure there is an 8 to 10mm expansion joint. Cut off the redundant part of the last row.
Step 6: Enjoy the floor
Just waiting for 24 hours after its installation, you can enjoy your new floor.
|